Tcl & Tk/확장 패키지 (Extension Package)
TkTreeCtrl 2.2.10
티클러
2024. 8. 13. 14:44
홈페이지: http://tktreectrl.sourceforge.net/
TkTreeCtrl is a multi-column hierarchical listbox widget for the Tk GUI toolkit.
Tcl/Tk의 대표적인 트리/리스트 위젯입니다.
tktreectrl-2.2.10.tar.gz
0.71MB
tktreectrl-2.2.10-Tk8.5-win32.zip
0.40MB
tktreectrl-2.2.10-Tk8.4-win32.zip
0.40MB